01 / 4 MW
AI Compute Node
Your first node: one powered, cooled, operated facility, up in months, not years.*
*Subject to fuel supply, permits, equipment availability and final engineering.
AI Infrastructure. Power. Compute. Community.
We turn land and power into deployment-ready AI infrastructure.
OP MACH4. A powered land strategy that can scale.
Grid interconnection queue
Two years or more
OP MACH4 on a qualified site
6 to 12 months*
*Subject to fuel supply, permits, equipment availability and final engineering.
Power first. Then compute.


Olive Power Microgrid AI Compute Hub (OP MACH4) deployments plan site development, power, cooling and compute hardware deployment as one system, with an onsite microgrid designed in from the beginning and sized to each site: solar and battery storage behind the meter as primary power, with optional generation where the site supports it. Capacity starts with one node and grows with demand, and the community is involved from the start.
*Subject to fuel supply, permits, equipment availability and final engineering.
Development process
AI infrastructure requires more than equipment. Power availability, cooling, connectivity, permitting and community acceptance determine whether capacity can actually get built.
Olive Power integrates these requirements into one development process: identifying viable opportunities, retiring development risk and delivering infrastructure ready for AI compute.

Infrastructure designed as one system
Start with deliverable power and a viable path to deployment.
Factory-integrated, containerized nodes deployed incrementally as demand grows.
An onsite microgrid with solar and battery storage behind the meter as primary power, optional generation such as natural gas, wind, biogas or geothermal, and the grid as backup.
Closed-loop air and liquid cooling matched to your hardware. Hybrid architectures, GPU immersion and other advanced cooling solutions available.
Plan infrastructure around local resources, operating impacts and economic opportunity.


Introducing OP MACH4: Olive Power's containerized, microgrid-powered AI compute, in three sizes.
Facility load
4 MW
AI Compute Node

01 / 4 MW
Your first node: one powered, cooled, operated facility, up in months, not years.*
*Subject to fuel supply, permits, equipment availability and final engineering.

02 / 8 MW+
Two or more nodes on one microgrid, for production inference and training clusters.

03 / 20 MW+
The same architecture, colocated to scale toward 200+ MW behind the meter.
Sizes are facility load.
Every MACH4 runs on its own onsite microgrid: solar and battery storage behind the meter as primary power, optional generation where the site supports it, and the grid as backup.
*Subject to fuel supply, permits, equipment availability and final engineering.
Why behind the meter?
~30%
Bring us your workload, target launch date and site or location requirements. Your initial MACH4 review covers:
Solutions
From site readiness to operating compute

We look at land, power, fiber, water, zoning and community fit together. A site is viable when all six line up.
Viable site: Powered · Connected · Permitted · Buildable · Aligned with the community

Every Olive Power development begins with the power strategy. Every MACH4 runs on its own onsite microgrid:
The objective is a resilient, site-specific power architecture capable of supporting deployment today while preserving a path for expansion.

OP MACH4 delivers AI capacity in factory-integrated, containerized nodes that are craned into place. Start with an initial deployment. Add nodes as compute demand grows.
Sizes are facility load. This approach can reduce the need to commit to an entire hyperscale campus before the first workloads come online.
Training, inference, enterprise AI and high-performance computing impose different requirements on power density, cooling, networking and operations. We start with the intended workload and hardware architecture, then develop the infrastructure around it.
Not every AI workload belongs in a massive centralized campus. Distributed infrastructure can support enterprise AI, regional inference, high-performance computing and workloads, augmenting the options for location, latency, data control, available power, security and speed to market.
Where to start
Tell us about the land, the power or the workload, and we will look at whether it fits the platform.
We evaluate land, zoning, access, fiber, power, environmental conditions and community fit to determine whether a location warrants further development.
Markets
Olive Power is developing a pipeline of distributed AI infrastructure opportunities in Colorado and Louisiana. Each opportunity moves through the same stages.
Denver region
Existing buildings and greenfield land evaluated for phased node deployment.
Development site
Site control in place, with development planning under way.
A site moves to the next stage only when the documents behind that stage are in place.
Under evaluation
Site, power, access and community fit are being assessed. Some sites will not proceed.
Site secured
A signed option, lease or purchase agreement is in place.
In development
Power, permitting and design are advancing.
Under construction
Permits are issued and construction is under way.
Operating
The facility is commissioned and in service.
Community

Data infrastructure becomes part of the community where it operates.
Olive Power considers power, water, land use and operating impacts alongside opportunities for local investment, workforce development, procurement and education.
Our AI Centers of Excellence will connect the infrastructure investment with practical AI education, workforce development and locally relevant applications.
Specific commitments are agreed with each community for each project.
Request a Community BriefingOP MACH4 is Olive Power's containerized, microgrid-powered AI compute, delivered in three sizes: the AI Compute Node (4 MW), the AI Compute Hub (8 MW+) and the AI Compute Campus (20 MW+). Sizes are facility load. Factory-integrated units are craned into place and run on their own onsite microgrid.
Each MACH4 runs on an onsite microgrid: solar and battery storage behind the meter as primary power, optional generation such as natural gas, wind, biogas or geothermal where the site supports it, and the grid as backup. Roughly 30% of new data center capacity is now going behind the meter at this scale, and the interconnection queue is not getting shorter.
We target 6 to 12 months on qualified sites, subject to fuel supply, permits, equipment availability and final engineering.
Training, inference, enterprise AI and high-performance computing. Distributed infrastructure also suits regional inference and workloads, improving the options for location, latency, data control, available power, security and speed to market.
MACH4 matches air and liquid cooling to your hardware. Cooling is closed-loop and zero-water (WUE 0.00).
Yes. The first node establishes the foundation for the next phase. Additional nodes expand capacity using the site's existing development work, power strategy and operating infrastructure. How far a site can expand depends on the power available there.
Land, power, fiber, water, zoning and community fit. A site is viable when all six line up: powered, connected, permitted, buildable and aligned with the community.
Start from Get Started: book a meeting with our team, or take the optional accelerated MACH4 path (watch the overview, register, accept the NDA, complete the discovery guide and schedule). Your initial MACH4 review covers which size fits, the plausible power route, cooling configuration, an indicative schedule and expansion path, and an initial commercial structure. You can also reach us through the Contact page.
Olive Power integrates community considerations into the development process from the beginning, before a site and design are selected. We consider power, water, land use and operating impacts alongside opportunities for local investment, workforce development, procurement and education.
Olive Power is developing a pipeline, starting in Colorado and Louisiana. Each opportunity moves through five stages (under evaluation, site secured, in development, under construction, operating) and a site moves to the next stage only when the documents behind that stage are in place.
Start a project discussion
Tell us your workload, location, capacity requirement and target timing. We'll identify the critical infrastructure requirements and determine the path forward.